礪志PMP模擬題本周精選12
A change control system should include all the following except-
a.Procedures for automatic approval of defined categories of change
b. Paperwork, tracking systems, and approval levels necessary for authorizing changes
c. A description of the powers and responsibilities of the change control board
d. Procedures for conducting a midproject control system review
Qustions 3:
Two fundamental objectives of project control are to--
a. Alter activities to achieve results and manage organizational assets
b. Eliminate unexpected technical problems and identify technical difficulties that require more resources
c. Ensure that resources are available when needed and avoid increases in the scope of work
d. Have the required material, personnel, and equipment available when needed and ensure that budgeting is adequate
Qustions 5:
The project plan is important in change control because it--
a.Provides the baseline against which changes are managed
b. Provides the information on project performance
c. Alerts the project team to issues that may cause problems in the future
d. Is expected to change throughout the project
Qustions 2:
Written changes orders should be required on --
a. All projects, large and small
b. Large projects
c. Projects with a formal configuration management system in place
d. Projects for which the cost of a change control system can be justified
Qustions 4:
The principal sources of project failure are-
a. Lack of a projectized or strong matrix structure, poor scope definition, and lack of a project plan
b. Lack of commitment or support by top management, disharmony on the project team, and lack of leadership by the project manager
c. Poorly identified customer needs, a geographically dispersed project team, and little communication with the customer until the project is delivered
d. Organizational factors, poorly identified customer needs, inadequately specified project requirements, and poor planning and control
Qustions 6:
Interface management is --
a.Considered to be one of the easier aspects of implementing the project plan
b.Primarily concerned with the technical issues associated with linking system components in a configuration
c.Facilitated by use of the WBS to display the ways people on the project interact and their duties and responsibilities
d.The process of coordinating the various elements of the project so that they meet their joint goals of performance, schedule, and budget
- 1建筑工程項目管理軟件
- 2軟件項目管理工具
- 3項目管理系統
- 4工程行業(yè)科研項目管理系統
- 5工程項目管理軟件下載
- 6開源項目管理系統下載
- 7工程項目管理
- 8多項目管理
- 9項目管理
- 10哪家項目管理好
- 11企業(yè)項目管理排名
- 12項目管理系統有哪些
- 1某道路改造及管線鋪設工程施工組織設計
- 2地震專家:水庫蓄水與大地震無必然聯系
- 32015年監(jiān)理工程師《建設工程合同管理》練習題(95)
- 42015年注冊安全工程師考試《管理知識》:預警評價指標
- 5黃土地基上的路堤填筑要求
- 62015年造價員基礎知識:工程造價信息的管理
- 7預算拮據之裝修房子的10個重要點
- 82015年二級建造師《施工管理》每日一練匯總
- 92012一級建造師《公路工程》正版考試用書增值服務第三次
- 102015年安全工程師相關法規(guī)模擬練習(12)
- 11江蘇堅持在村莊環(huán)境整治中反對形式主義 落實長效機制
- 12造價工程師建設工程造價管理復習資料——設備租賃與購置分析
- 132015年二級建造師《市政》:預算、計劃、統計、合同人員的管理責任內容
- 142015年深圳造價工程師考試用書預訂注意事項公告
- 15機場建設費飽受爭議變身民航發(fā)展基金 一年29億支出無明細
- 16安全工程師考試《法律法規(guī)》習題班講義精選(30)
- 172015年監(jiān)理工程師《建設工程三大控制》練習題(54)
- 182015造價員《土建工程》知識點:浮籠
- 192015年招標師《項目管理與招標采購》講義(3)
- 20建設項目董事會的職權包括哪些
- 212015年咨詢工程師《組織與管理》模擬題(3)
- 22建筑深基坑工程主要特點有哪些
- 232015年注冊咨詢工程師《工程咨詢概論》模擬題(37)
- 24淺談土工膜在混凝土壩缺陷修補中的應用
- 25公園道路園林綠化施工組織設計
- 262015招標師職業(yè)水平考試考點:行政法律責任
- 27監(jiān)理工程師考試2015年《建設工程合同管理》練習題(7)
- 28攪拌車發(fā)動機保養(yǎng)小知識
- 292015年咨詢工程師《工程咨詢概論》每日一練7.9
- 302015年咨詢工程師每日一練免費在線測試(2015.11.14)
成都公司:成都市成華區(qū)建設南路160號1層9號
重慶公司:重慶市江北區(qū)紅旗河溝華創(chuàng)商務大廈18樓