PMP美國項目管理認證的模擬考試的樣題5
assembly lines commonly include:
A. a directing style of leadership.
B. a lack of confidence in their workers
C. assumption that workers lack ambition and dislike responsibility
D. a Theory X style of leadership
E. All of the above.
ANS: E
2. Quality management:
A. is another name for careful inspections.
B. is inversely related to productivity.
C. is primarily the responsiblity of management.
D. is primarily the responsibility of the workers.
E. is essentially a motivational technique.
ANS: C
3. Risk management allows the project manager and the project team
to:
A. eliminate most risks during the planning phase of the project
B. identify project risks
C. identify impacts of various risks
D. plan suitable responses
E. B, C and D only
ANS: E
4. Scheduling is the process by which decisions are made concerning:
A. Tasks to be accomplished.
B. Personnel/organization that will be assigned to accomplish the
task.
C. Time when the tasks are to be completed.
D. All of the above.
E. A and C only.
ANS: E
5. The basic elements of communication include:
A. Listening, talking and sign language.
B. Communicator, encoding, message, medium, decoding, receiver, and
feedback
C. Clarity of speech and good listening habits
D. Reading, writing and listening
E. All of the above
ANS: B
6. Which of the following would most likely increase the accuracy of
estimating the project cost?
A. Pricing out the work at lower levels in the work breakdown
structure.
B. Using historical data.
C. Talking to people who have worked on similar projects.
D. All of the above.
E. A and C only.
ANS: D
7. A variance envelope has been established on a project. The
envelope goes from +-30% in R&D to +-5% during manufacturing. The
reason for
the change in thickness of the envelope is because:
A. The management reserve has been used up.
B. The accuracy of the estimates in manufacturing are worse than the
estimates in R & D.
C. Tighter controls are always needed as a project begins to wind
down.
D. Of the personal desires of the project sponsor.
E. Of none of the above
ANS: E
8. Cost of quality is:
A. associated with non-conformance to specifications and
requirements.
B. primarily caused by poor workmanship of workers who are building
or manufacturing the product.
C. used to determine whether a quality management program is suitable
for a given project.
D. negligible for most large projects.
E. A and B
ANS: A
9. Management plans include all of the following except:
A. Organization of project.
B. Job descriptions.
C. Policies and procedures.
D. Linear responsibility charts.
E. Scope baseline.
ANS: E
10. The Japanese resource management model exhibits:
A. a cooperative spirit of goal setting.
B. non-specialized career paths
C. frequent changes in team assignments
D. a Theory Z style of management
E. All of the above.
ANS: E
- 1最大核電規(guī)劃項目開工 核電重啟
- 2路塹客土噴播植草施工方案23p
- 3招標師職業(yè)水平考試:項目管理與招標采購第二章練習題33
- 4安全工程師生產(chǎn)管理復習要點:徑集數(shù)
- 52015年咨詢工程師《決策分析與評價》模擬題(15)
- 6未列入合同文件的地質(zhì)資料使用問題
- 72015年貴州安全工程師考試報名時間為6月1日-6月21日
- 8某駁岸圍堰專項施工方案
- 9江西省關(guān)于2015年度造價師網(wǎng)絡(luò)教育收款收據(jù)換取發(fā)票的通知
- 10《項目管理與招標采購》輔導:項目進度管理體系
- 11安全工程師案例分析復習要點:火災
- 12建設(shè)工程施工全過程安全監(jiān)理
- 13灌注水下混凝土時鋼筋籠上升的預防及處理
- 142015年一級建造師《通信與廣電》知識摘要(11)
- 152015年造價工程師《理論與法規(guī)》課程講義(5)
- 16引水隧洞施工組織設(shè)計84p
- 17金沙江魯某水電站保通隧道工程施工組織設(shè)計
- 182015年寧夏注冊安全工程師報名入口
- 192015招標師成績:法規(guī)81、管理85、實務(wù)76、案例74
- 202015年齊齊哈爾造價工程師現(xiàn)場審核地點及時間
- 21小型混凝土攪拌車驅(qū)動裝置的維護工作
- 222015安全工程師《生產(chǎn)管理知識》試題精選(2)
- 232015年咨詢工程師《宏觀經(jīng)濟政策》練習題(50)
- 242015年一級建造師考試《法規(guī)及相關(guān)知識》沖刺習題(13)
- 25某公園水景工程施工組織設(shè)計
- 262015造價員《土建工程》知識點:防水涂料
- 272015年安全工程師考試《安全生產(chǎn)法及相關(guān)》輔導資料(25)
- 282012一級建造師《機電工程》焊接材料的分類
- 29普通碳素結(jié)構(gòu)鋼進場外觀檢查的內(nèi)容是什么
- 30招標師考試:項目融資風險管理
成都公司:成都市成華區(qū)建設(shè)南路160號1層9號
重慶公司:重慶市江北區(qū)紅旗河溝華創(chuàng)商務(wù)大廈18樓